اگر گھر میں دو تین اے سی یا موٹر چلتی ہے تو تھری فیز میٹر بہتر ہے۔ 5 کلو واٹ یا زیادہ لوڈ پر ٹی او یو میٹر لگتا ہے جس میں پیک اور آف پیک یونٹس کا ریٹ الگ ہوتا ہے۔
Building a new house or adding two or three ACs? The question comes up: do you need a three phase meter, or is single phase enough? And some people suddenly see separate Peak and Off-Peak units on their bill — that’s a TOU meter. This guide explains both.
Single phase vs three phase
| Single phase | Three phase | |
|---|---|---|
| Wires | 1 phase + neutral | 3 phases + neutral |
| Suitable for | Small and medium homes | Large homes, 3+ ACs, motors, workshops |
| Load | Lower sanctioned load | Higher load, shared across three phases |
| Voltage drop | Voltage can drop under heavy load | Better voltage, heavy motors run easily |
| Minimum bill (if no fixed charge) | Rs 75 | Rs 150 |
Homes typically run on a single phase connection up to 5 kW. Above that, the company provides a three phase connection.
What is sanctioned load?
Sanctioned load is the maximum electricity (kW) you can use at one time — shown as SAN LOAD on your bill. Since 2026, fixed charges are based on this load (for example Rs 300 per kW for unprotected 101–200 units). So a higher load than you need means higher fixed charges every month.
A simple estimate: add up the watts of everything that runs at the same time. For example 2 inverter ACs (1.5 kW each) + fridge + fans/lights (1 kW) ≈ 4–4.5 kW.
What is a TOU meter?
A TOU (Time of Use) meter records units by time of day: peak hours (4 evening hours) and off-peak (the remaining 20 hours). Homes with a sanctioned load of 5 kW or more get a TOU meter and are billed peak/off-peak rates instead of slabs:
| 2026 rate (home, 5 kW+) | Rs per unit |
|---|---|
| Off-peak | 34.53 |
| Peak | 46.85 |
| Fixed charges | Rs 675 per kW (on 50% of load, or MDI) |
Peak timings change with the season — in November they are 6 pm to 10 pm. Full table: Peak Hours 2026.
Is TOU better or worse?
TOU has no slab jump — even at 700 units the off-peak unit stays at Rs 34.53, while on a normal meter every one of 700 units is billed at Rs 41.85. So TOU is often cheaper for high-usage homes — if most heavy use happens outside peak hours. Compare both in the Bill Calculator (enter a load of 5 kW or more).
How to get three phase or increase your load
- Apply online for “Change of Load” on the ENC portal (Electricity New Connection), or visit your sub-division office.
- Keep your CNIC, electricity bill and wiring contractor’s test report ready.
- The company surveys the site and issues a demand notice covering the meter, cable and security.
- Pay the demand notice at the bank and submit/upload the receipt.
- After the meter is changed, the new load and rate apply from the next bill.
Full new connection process: New Electricity Connection Guide.
Frequently asked questions
Will reducing my load lower my bill?
Your fixed charges will drop. But if your actual use exceeds the sanctioned load, you can be penalised based on MDI. Work out your real load first.
What is MDI on my bill?
MDI (Maximum Demand Indicator) is the highest load you used during the month. On TOU connections, fixed charges are sometimes calculated on MDI.
Do I need three phase for solar?
Most home systems up to 10 kW run on a single phase inverter. For systems above 10 kW or a three phase connection, a three phase inverter is better.